Project

General

Profile

Actions

Task #66390

closed

Task #66389: Frame Set

Frame

Added by Benoit Maxime 4 months ago. Updated 4 months ago.

Status:
Closed
Priority:
Normal
Assignee:
Start date:
04/13/2026
Due date:
04/30/2026
% Done:

100%

Estimated time:
0.00 h (Total: 128.00 h)
Tags:

Description

The unit tubular steel structure to which other components are attached. Provides basic design and strength.


Subtasks 5 (0 open — 5 closed)

Task #66391: Design FrameClosedBenoit Maxime04/13/202604/16/2026

Actions
Task #66392: Create Frame Design PrototypeClosedBenoit Maxime04/13/202604/17/2026

Actions
Task #66393: Finalize DesignClosedBenoit Maxime04/20/202604/22/2026

Actions
Task #66394: Build FrameClosedBenoit Maxime04/23/202604/28/2026

Actions
Task #66395: Paint FrameClosedBenoit Maxime04/29/202604/30/2026

Actions
Actions

Also available in: Atom PDF