Actions
Task #66390
closedTask #66389: Frame Set
Frame
Start date:
04/13/2026
Due date:
04/30/2026
% Done:
100%
Estimated time:
0.00 h (Total: 128.00 h)
Tags:
Description
The unit tubular steel structure to which other components are attached. Provides basic design and strength.
Actions