Actions
Duty #66179
openDuty #63711: Software meetings
Meeting 19/05/2026
Start date:
05/19/2026
Due date:
% Done:
0%
Estimated time:
Description
Agenda:
- peak in patch per detector (Ismail)
- simulation results (Haochen)
Updated by Huchet Alexandre 18 days ago
Minutes:
- Reconstruction from simulations (Haochen):
- very high noise level, might be a plotting issue?
- or maybe due to convolution_out=True and high nsub?
--> try with convolution_out=False
- Peak containment in the patch (Ismail):
- try with kmax>1 to have a better coverage of the power of each detector on the sky
- look at the effect of the speed being lower near the edge of the patch
- Responsivity test (Eva):
- working on 2022 data
- trying to automatise a test pipeline
Actions