Feature #1165
closedCall z_supp_on after 'electronics calibration run' ends
Start date:
08/16/2010
Due date:
08/21/2010
% Done:
90%
Estimated time:
Description
2010-08-16T17:41:23+0200
- compare scripts
- get in touch with JLC
- deploy
Updated by Lafage Vincent over 14 years ago
2010-08-20T02:09:10+0200
LOAD_FERO.sh
prepares pedestals and includes
$CROCUS_SCRIPTS_PATH/zSupOn.x -m $Minor -c $Channel -f $TMP_CONFIG/zSupOn${aEqId}.dat > /tmp/zSupOn${aEqId}.resSET_PULSE.sh
prepares calibration but doesn't include a ZSupOn
CHECK_FERO.sh
does nothing
We need to discuss (Franco) what each of those is supposed to achieve in fact
Updated by Lafage Vincent over 14 years ago
- Due date set to 08/21/2010
- Status changed from Assigned to Resolved
- % Done changed from 0 to 90
2010-08-21T01:38:16+0200
In fact, things occurs at the next level:
Franco will have a LOAD_FERO.sh launched at the end of a calibration run so that
a full pedestal run be not undertaken and time be consequently saved.
Beyond our control, then...
The (commented) tests that appears at the end of LOAD_FERO.sh (RdRam?, for instance)
should be inserted in CHECK_FERO.sh