Project

General

Profile

Task #51454

Updated by Colley Jean-Marc about 2 years ago

première itération pour le pipeline de simulation: 

 R for Requierement, T for Task. 


 R1 : data and computing only at CCIN2P3 
 R2: minimal database with sqlite 
     - only simulation (no raw data from detector unit) 
     - small number of attribut: primary , energy, angle shower, site position, place of data in /sps 
     - but can manage several runs of simulation 
 R3: 2 main tasks : 
     - T1 : Aires/ZHAIres on small network (no interpolation step), EField in ZHAIRES format (not yet with ROOT format) 
     - T2 : Antenna responses from GRANDLIB, possibly with ROOT format 
 R4: test with small network like GP13, may be T1 can be with a fake AIres/Zhaires executables to save computational time during the pipeline development phase 
 R5: possibility of having 
     - T1 and T2 in same job to avoid massive resubmission for T2 after T1 
     - computing T1, T2 independently 

Back